2015-2016
Engineering and Design Challenges:
- 
Loading on System
- 
Large enclosed tidal volume
 - 
Smaller available geotextile filter area, especially at mid to low tide
 
 - 
 - 
Achieving Adequate Filtration
- 
High flux rates (flow per unit area)
 
 - 
 - 
Transitions:
- 
Interface of TRB with SPW top
 - 
Connections between full-depth barrier and SPW section
 
 - 
 - 
Barge Gate Design and Operation
 
Solutions:
- 
Robust anchoring elements
 - 
Custom filter composite
 - 
Durable transition interfaces
 - 
Innovative access features
 
Outcome:
- 
Compliance achieved – monitored daily at six water quality testing locations
 - 
Design aspects adjusted and addressed during installation and commissioning period due to quick/shorter design period
 